Been a busy week onsite – a major milestone has been reached.
We made a visit to site on Thursday to meet Ben The Builder and could see that the Maxraft foundation work had been done. You get a better idea of the the insulation coverage that Maxraft provides, particularly around the edges.
Also on the day, the pipework for the underfloor heating was being laid. You can see from the photo’s that the floor plan has been spray painted onto the foundation work. This is done so they can see where the walls are and where to avoid laying any pipework so it doesn’t get damaged when the framing is secured to the slab.
After the slab is poured and cured and the boxing is removed, the exterior perimeter of the Maxraft polystyrene gets a layer of fibre reinforced plaster to protect it from water, vermin and UV.
The foundation was due to be poured on Friday and sure enough, our visit to site on Saturday, was greeted with a completed foundation. The water sprinkler is there to keep the concrete from drying too quickly and cracking. Also noticeable is the lower height of the ground floor shower base, as this is a walk-in tiled shower.