Insulation, and plenty of it!

With all the electrical and plumbing done as well as the data cabling, our builders have wasted no time in getting on with installing the insulation.

To compliment the 140mm exterior framing, we’re installing R4.0 rated insulation in all exterior walls and in the ceiling where are putting in R6.0 (these are 260mm thick!). These are the highest R value single batts we can obtain for the space. The interior walls are R2.6 and the midfloor are R3.2.

GIB plasterboard supplies are also onsite ready to go up in a few days time.

Work on the retaining wall continues as the palings are now being added.