This week we had our plumbing and electrical walkthrough.
With the electrician it was deciding on where every power point and light switches will be, data cabling requirements, security requirements and lighting. Fortunately, we’d already pre-planned where we had wanted the light switches so it was really straight forward. Although when we got to the main bathroom the door swing and the shower size and location meant we had to shift the towel rail to a different wall to be able to locate the switches in a logical place. Things you don’t notice on the floorplan!
Then with the plumber on the location and position of taps and shower heads as well as exterior taps.
The joinery for the corner sliding doors and delivered and installed as well, doors to follow and along with one last window for the front of the house, will complete all the joinery.
Also we have more beige cladding installed and not far from it being complete.