House is locked up.

The cladding installation is almost complete with just a small area at the front to do. 

The corner door has now gone in and as well as the one missing window due to the anodized finish not being up to our builders standards – the house is now locked up.

Now that the cladding has gone up on the top half of the house, they’ve been able to take down the scaffolding around the rear of the house in preparation of Earthworks Part 2.0. 

Running behind all the houses on our side of the street is an engineered batter which our rear boundary is halfway up.  We’ve decided to excavate into this batter and build a 1.5m retaining wall, effectively doubling the outdoor area at the back of the section, visible by the orange spray painted line.